Advice on keeping equipment during site closures

Mar 30, 2020

Advice on Ischebeck Titan equipment during site closures
During any extended period of site closure, it Is important that we ensure all formwork and falsework is in a safe condition and remains so for the duration of the closure. In the first instance the technical drawings along with the product specific method statement from Ischebeck Titan (in conjunction with site specific RAMs) should be reviewed for any residual risks to the equipment during use or due to inclement weather. Any checks or remedial action resulting from these residual risks must be carried out before site closures.