Case Study

April 15, 2024

Chris Garner – Professional Development

Chris Garner joined Ischebeck Titan in the design office in 2013 at the age of 16, fresh out of school. Over the past ten years, he has made significant contributions to the Ischebeck Titan team and substantial strides in his own career
March 20, 2024

Highfurlong Brook Viaduct

The Highfurlong Brook Viaduct in Banbury, is an important part of the infrastructure required for a stretch of the HS2 national railway project to allow safe passage over the High Furlong brook. The structure spans over 163m in length and stands at 6m high and was constructed with 2 Abutments and 6 piers, all of which...
March 18, 2024

University of Derby Business School

We were tasked with producing a climbing formwork proposal for this narrow 5-storey core which could allow various complexities such as steel frame casting plates, large doorway openings in relation to the wall dimensions and a full roof capping slab detail.
January 31, 2024

Parabola

The Parabola building formerly known as the CommonWealth Building, is an iconic tent-like structure that sits on Kensington High Street. The Parabola’s initial construction was a bold piece of architecture for when it was built in the 1960’s with a hyperbolic paraboloid copper roof...
September 24, 2023

Blackhill Quarry

We were tasked with producing a climbing formwork proposal for this narrow 5-storey core which could allow various complexities such as steel frame casting plates, large doorway openings in relation to the wall dimensions and a full roof capping slab detail.
February 7, 2023

Bradford Markets Regeneration

We were tasked with producing a climbing formwork proposal for this narrow 5-storey core which could allow various complexities such as steel frame casting plates, large doorway openings in relation to the wall dimensions and a full roof capping slab detail.
October 31, 2022

HD FAB – Buchanan Wharf, Scotland

Bray Head is situated in County Wicklow, south of Dublin in the Republic of Ireland. The route around the headland was surveyed and engineered by none other than Isambard Kingdom Brunel, who at the time was engaged with the construction of the Dublin & Wicklow Railway’s line from Bray to the county town of Wicklow further south.
June 13, 2022

GE -Belfast Harbour

This was a challenging project in terms of access, logistics, ground conditions and design at Belfast Harbour. The type of conditions where Ischebeck Titan ground anchor solutions are regularly called for. In 1990 a ground investigation near to the site was undertaken and the bore hole records showed mixed, variable, and challenging conditions.
February 11, 2022

Bletchley Flyover

The East West Rail scheme will re-establish a rail link between Cambridge and Oxford for the first time in 50 years to improve connections between East Anglia and central, southern and western England. Serving communities across the area, it will bring faster journey times and lower transport costs as well as easing pressure on local roads.
Bletchley Flyover