Column Forms

Climbtrac

Outinord Tunnel Form

Folding Gable Platforms

  Outinord Tunnel Form

Outinord Tunnel Form is a steel formwork system that allows you to pour walls and slabs in one operation.

The main component of the system is the half tunnel.  Two half tunnels joined together form the complete tunnel form. Once concrete has been poured, and minimum strength has been achieved, the half tunnel units are removed, and, if required a continual back prop can be installed before the adjacent half tunnel has been stripped. This guarantees no adverse deflection of the slab.

The tunnel is tailored to fit the room width, height and length (16m long typically) by the inclusion of infill sections which form an integral part of the tunnel. Follow on trades can begin work on the cells  after each days striking and the high quality   steel faced finish massively reduces the cost and time involved in ‘wet trade’ activity

Tunnel Form is a high precision system which is fast and user friendly and can effectively half precious crane time.

Ischebeck Titan Ltd are sole distributers of  the Outinord Tunnel Form system in the United Kingdom


Download the Outinord Tunnel Form brochure